Hampton Inn Madeira Beach

PROPERTY DETAILS

DESCRIPTION:

Madeira Beach Project, LLC was formed in 2018 for the acquisition of a vacant piece of land located at the southwestern base of the Tom Stuart Causeway bridge. The property sat vacant for years after the demolition of the former Leverock’s restaurant.

The Madeira Beach Project, LLC development program features 31 high-end residential rental units, a 100-slip marina with plenty of transient slips for day trippers, a 130-unit limited service Hilton hotel, a 5,000 sf restaurant and 3 separate pools.  The completed development site will have 251 parking spaces and plenty of room for the variety of uses on the property. The project is anticipated to break ground in the Fall of 2019.

The development site is less than a mile from the beach, 35 minutes from Tampa International Airport and 25 minutes from St. Pete / Clearwater International Airport. The project will be a true destination location for vacationers, boaters, restaurant goers and local residents.

Some unique property features include a large outdoor waterfront event space that will allow the property to host concerts, markets and community gatherings. The marina will feature a technologically advanced application that will enable boaters to utilize the app to reserve transient dock space for leisure day trips. The property will also feature a waterfront boardwalk, an elevated pool exclusively for hotel guests and a separate marina pool that both boaters and hotel guests will be able to enjoy.

PROJECT STATS:

Name Hampton Inn Madeira | Residences + Marina
Address 555 150th Avenue
Location Madeira, FL
Size 4.56 AC
# of Hotel Units 130
# of Res. Units 31
# of Marina Slips 100